Starting articles is easy to measure and poor evidence of progress. When drafting outpaces research and review, the queue fills with nearly finished work that still needs scarce judgment.
Set limits by stage
Give research, drafting, editorial review, and release their own visible limits. Base them on actual reviewer capacity, not the number of ideas available. When a stage reaches its limit, help finish or unblock existing work before pulling another item.
Define what counts
A draft waiting for a source is still work in progress. A page awaiting a scheduled deployment may be release-ready if every other gate has passed. Write these definitions so the metric cannot be improved by moving cards between columns.
Treat pressure as information
A repeatedly full review column may mean briefs are weak, drafts are too large, or the reviewer owns decisions that could be delegated. Adjust the operating system after observing the pattern; do not simply raise the limit.
Pair the limit with the daily content capacity signal. Capacity decides what the system can accept; WIP limits keep accepted work flowing to completion.
The goal is not maximum volume. It is a dependable route from useful idea to accurate, reviewable, live article.